Construction of a new booster station for the City of Salmon Arm's domestic
water distribution system. The work included:
* Site works such as clearing, grubbing, site grading, hydroseeding, and
paved parking area
* Concrete foundation and wood frame booster station building including
electrical and HVAC systems
*Supply and installation of 300kW outdoor backup generator on concrete
pad
*Suppy and installation of three 125hp vertical turbine pumps and
associated mechanical piping
* Pump station controls, electrical and SCADA system, integration into city's
water system
* Civil works including tie-in to existing watermains
Construction of Brooke Drive Overpass prestressed concrete stringer bridge with cast in place deck and barrier.
Construction of cast in place retaining wall.
Replacement of deck joints and rehabilitation of Chase Creek Bridge No. 2257
Adding a cast in place concrete 160,000L reservoir to the Nicola Lakeshore Estates Subdivision