Construction of a new booster station for the City of Salmon Arm's domestic
water distribution system. The work included:
* Site works such as clearing, grubbing, site grading, hydroseeding, and
paved parking area
* Concrete foundation and wood frame booster station building including
electrical and HVAC systems
*Supply and installation of 300kW outdoor backup generator on concrete
pad
*Suppy and installation of three 125hp vertical turbine pumps and
associated mechanical piping
* Pump station controls, electrical and SCADA system, integration into city's
water system
* Civil works including tie-in to existing watermains