Big Rock replaced an aging concrete dam at Pinaus Lake with a new cantilevered sheet pile dam. The scope of work also included installing a steel catwalk for access, a log boom to reduce floating debris, and rip rap along the lake and creek shores. Prior to installing the sheet piles, a coffer dam was built and the creek was diverted around the work site to maintain aquatic habitat and fish life.
Back to All Events
Earlier Event: September 1
Memorial Arena Parking Lot Rehab
Later Event: June 1
Parks Canada Trail Bridges